RFQ Preparation Checklist
- 2D drawings, STEP files, winding diagrams, lamination DXF, and revision history
- Electrical steel grade, copper specification, insulation class, and varnish/VPI requirements
- Target tolerances, CTQ dimensions, inspection plan, and sample acceptance criteria
- Prototype quantity, pilot quantity, annual forecast, and desired production ramp timing
- Required reports, certificates, packing standard, Incoterm, and destination country



