RFQ Preparation Checklist
- Torque-speed map, peak/continuous power, base speed, and maximum speed
- Voltage platform, inverter current limits, excitation window, and sensor interface
- Cooling constraints: water jacket, oil spray, hybrid, or customer housing limit
- Stator/rotor drawings, airgap, stack length, shaft, housing, and connector envelope
- Validation plan: dyno points, thermal rise, overspeed, balance, insulation, and acceptance reports
- Prototype quantity, pilot quantity, annual forecast, program stage, and delivery country



